Passive fire protection, Gold Coast
Passive fire protection and certification for Gold Coast commercial projects
Fire Frog installs and certifies passive fire systems on commercial buildings, units, townhouses and shopping centres across the Gold Coast, sealed to the tested system specification so the job signs off.
Fire Frog is a QBCC-licensed passive fire contractor working commercial sites across the Gold Coast, from offices and new-build units and townhouses to shopping centre fit-outs and high-rise residential. For builders looking for fire protection on the Gold Coast, Fire Frog installs and certifies the passive side: penetration sealing, fire collars, joint sealing and bulkheads.
Andy Leaf-Milham has worked Gold Coast high-rise before, including the Meriton tower at Southport at roughly seventy floors, so stacked services through wet-area slabs high in a tower are familiar work. Every cable and pipe penetration, fire collar and construction joint is installed to the manufacturer's tested detail, so the rating of the wall or slab is restored and the work can be certified.
Gold Coast builders bring Fire Frog in for new work and for rectification, bringing penetrations up to a tested system so a building can be signed off.
What we do in Gold Coast
- Fire-rated penetration sealing for cable and pipe penetrations on Gold Coast commercial builds
- Fire collars supplied and installed on plastic pipe penetrations to the manufacturer's tested detail
- Fire-rated joint sealing for construction joints, head-of-wall and slab edge details
Our services in Gold Coast
Fire-Rated Penetration Sealing
Cable and pipe penetrations sealed to the tested system specification, so the fire rating of the wall or slab is maintained and the work can be certified.
Fire Collars
Supply and installation of fire collars on plastic pipe penetrations, sized and fixed to the manufacturer's tested detail.
Fire-Rated Joint Sealing
Fire-rated sealing of construction joints, head-of-wall and slab edge details, keeping the compartment intact where building elements meet.
Fire-Rated Bulkheads
Fire-rated bulkheads built to enclose and protect services where a penetration cannot be sealed on its own. Typically a two-day build on a commercial job.
Passive Fire Certification
Certification of installed passive fire systems, covering our own work and rectification of others', so the project can demonstrate compliance at handover.
Inspections and Annual Surveys
Inspection and testing of existing passive fire systems, including annual surveys, with a clear report on what fails and what it takes to bring it back to standard.
Rectification of Non-Compliant Passive Fire
Bringing existing penetrations and joints up to a tested system, so the building can be certified.
Tested systems
Systems we install to
Every penetration and joint is installed to the manufacturer's tested detail, which is what makes it certifiable.
Contact us
Get your Gold Coast project certified
Building on the Gold Coast? Send through the project details and we will come back with a scope and a price.


